Problem:

A pump impeller’s bore, keyway and wear ring had been badly damaged due to a missing impeller nut.  New impeller delivery was 4-6 weeks. 

The Arnolds Solution:

The impeller was bored out to accept a newly turned sleeve which was then welded into  position.  The weld was then machined to the original specification and a keyway was cut and the wearing turned down to remove imperfections. A new volute wearing was manufactured to suit the impeller wear ring.  Finally the impeller was rebalanced to ISO grade G2.5. 

The impeller was returned to the customer in 3 working days.

Benefit:

The impeller machining cost was 55 % of a new item.